Switching-test stations “Energomera” (STP)


Purpose

  • Designed for equipping of the test points, control-diagnostic and control-connection points on the pipelines and other underground metal structures for control of electrochemical protection along the pipeline routes, other underground structures and connection of the components of the electrochemical protection systems according to the design and operation documents.

Features

  • easy installation and maintenance of the plants;
  • opportunity of switching of power and test terminals by jumpers included into delivery;
  • multipurpose terminals;
  • The cap of the switchboard cabinet opening for 270?C represents the shelf for placing of the measuring instruments in the course of the measurements.
  • Presence of the route stake.
  • Configuration is the same for both simple grounds and loose grounds (marshy, sandy).

Technical specifications

Indices Values
Operation conditions by GOST 15150:
Climatic version UHL
Location category 1
Range of the operating temperatures of the environment from — 60°С to +50°С
Number of power terminals, pc 0, 2, 3, 4, 5, 62
Admissible section of conductors of power terminals, mm2 Up to 100
Number of instrumentation terminals, pc 0, 6, 121, 242
Admissible section of conductors of the drainage cables connected to the power terminals, mm2 Up to 100
Admissible section of conductors of the instrument cables connected to the instrumentation terminals, mm2 Up to 10

Embedding level, mm:

— For common grounds

— For loose (marshy, sandy)

800

1300

Mass of switching-test stations, not more than, kg:

— without the route stake

— with the route stake

28

31

Protection degree of the switchboard cabinet IP44
Service life of the plants, years 30

Notes:

  1. While using the switching test stations with indication of the number of instrumentation terminals “12” is provided by means of removal of closers between the doubled terminals.
  2. By the Customer’s requests other configurations of the switching-test stations can be produced by the number of power and instrumentation terminals, as well as by the level of embedding into the ground (length of the stand).